We recommend once you have taken delivery of your decking that it is left for a day before fitting to allow it to acclimatise to the new conditions. The decking can be installed using normal wood working tools. Safety equipment should also be worn including safety goggles, gloves and dust masks.

SUBSTRATE PREPARATION

The substrate should be flat, structurally sound and have a minimum of 6mm per metre slope to allow sufficient drainage to ensure water does not puddle under decking. If used on roof terraces it is important to ensure the felt is watertight and suitable rubber underlay is used as a separating layer. Ensure sufficient wastage is allowed for your project.

NEW ERA
DECKING RANGE

CHARCOAL

TEAK

GRAPHITE

OYSTER GREY

CHOOSE YOUR INSTALLATION OPTION
ACCESSORIES & SUBSTRUCTURE
ITEMNAMESIZELENGTHQUANTITY PER M2*
Starter ClipsN/AN/A3 to 4 per L/M
Nivodek ClipsN/AN/A27 per m2
Edging Strips40x40mm2900mmN/A
Composite Battens30x40mm2900mm3.6 L/M per m2
Treated Battens35x45mm &
45x45mm
2400mm3.6 L/M per m2
6/20 Nivodek Cradles79mm to 103mmN/A9 per m2
35/50 Nivodek Cradles108 to 133mmN/A9 per m2
Nivodek Cradle Packers1.5mm
3mm
6mm
12mm
N/AN/A

*based on 320mm batten centres