As the name suggests New Era provides a new standard in flooring levelling systems through progressive development and a complete understanding of problems inherent with uneven sub floors.
Yes, New Era Cradles are manufactured independently in West Sussex UK and are not made under licence anywhere else.
Yes, all components are made from 100% recycled external plastic parts.
Yes, the cradles have undergone extensive testing at AIRO Laboratory for acoustic compliance and The Centre of Sports Technology for sports, reaching the highest standards.
The floor can be levelled to finished floor heights of 74mm up to 433mm using the modular interlacing components.
Yes, New Era does not require any drying time and can be used immediately after installation.
Yes, New Era can be used instead of screed, but will require adequate insulation between the battens to ensure U Value compliance.
The flooring can easily take a load of 500KG per m2 on a spread load and 350kg per m2 point load on a standard install. These weights can be increased by using additional battens or plywood supports if extra weight is required for seating units, scissor lifts or free-weights etc. (Job specific requirements would be needed)
We look forward to hearing from you.
Copyright © New Era 2024 | All Rights Reserved.
Designed & Developed by Prowling Tiger Media